EXCAVATION PROJECTS
Owner / General: Chobani – Tippmann Construction
Tippmann Group
9009 Coldwater Road
Ft. Wayne Indiana 46825
(260) 490-3000
Project: Chobani Expansion
Description:
Contract Amount: $774,423.00
Architect/Engineer: Elite Edge Engineers
​
​
​
​
​
​
​
​
​
Owner/General: Clif Bar – McAlvain Construction
Project: Clif Bar Plant – Twin Falls, ID
Description: Excavation and Backfill of Concrete, Underslab MEP Excavation
Contract Amount: $1,272,251.00
Architect/Engineer:
​
​
​
​
​
​
​
​
​
​
Owner/General: Fabri-Kal
Project: Fabri-Kal Pure Pulp Factory Burley, ID
Description: Complete Site work and Site Utilities Package
Contract Amount: 1,515,899.00
Architect/Engineer: Rediesel Engineering
​
​
​
​
​
​
​
​
Owner/General: WOW Logistics
Project: Warehouse Expansion
Description: 193,500 Square Feet Warehouse expansions with complete Site work and Utilities package.
Contract Amount: $1,203,759.50
Architect/Engineer:
​
Owner/General: Jerome School District – Starr Corporation
2995 E 3600 N, Twin Falls, ID 83301
Project: Jerome School Horizon Elementary Site Remodel
Description: Removal and resurfacing of Asphalt Parking lots
Contract Amount: $449,877.00
Architect/Engineer: EHM Engineers, Inc.
​
​
​
​
​
​
​
​
Owner / General:
Idaho Power – Slayden Construction Group – Erik Helms
PO Box 247
Slayton, OR 97383
(503) 769-1969
Project: Shoshone Falls Power Plant
Description: Sitework subcontractor –Demolition of existing site conditions, Rock hammering of channel for water diversion, excavate and prep footings, foundations, and slabs.
Contract Amount: $625,775.00
Architect/Engineer: Kleinschmidt
​
​
​
​
​
​
​
​
Owner / General:
Glanbia Foods – Big D Construction – Doug Rowe
5768 S. 1475 E.
Ogden, UT 84403
(801) 392-3200
Project: Glanbia Gooding Polished Water and North Sump Pump
Description: Site work and Site Utilities subcontractor –Demolition of existing site conditions, build building pad and excavate and prep footings, foundations, and slabs. Parking lot preparation and asphalt paving and patching. Installation of process piping (HDPE fusion) for process drains. Excavation of sump pump, included rock removal.
Contract Amount: $244,883.00
Architect/Engineer: Mead Hunt
​
​
​
​
​
​
​
​
Owner / General:
City of Twin Falls – Petersen Brothers Construction
Project: Joslin Field Airport Snow Removal Building
Description: 18000 CY excavation of embankment to build building pad, Install water main and sewer pipe.
Contract Amount: $200,570.50
Architect/Engineer: Rediesel Engineering
​
​
​
​
​
​
​
​
Owner / General:
Shaw Farms - A&G Irrigation
8 Butte Dr.
Jerome, ID 83338
(208) 324-9551
Project: Shaw 750 Waterline Project
Description: Install approx. 15000 linear feet of irrigation pipe ranging from 12” to 30” pipe. Project included rock removal, canal embankment excavation & backfill.
Contract Amount: $310,000.00
Architect/Engineer: None
​
​
​
​
​
​
​
​
Owner / General:
City of American Falls –RSCI
1854 E Lanark St
Meridian, ID 83642
(208) 887-1401
Project: Waste Water Treatment Plant
Description: Sitework & Site Utilities subcontractor – Demolish existing building tanks to allow for new buildings & tanks. Excavation of 3 building structures & tanks – included rock removal in some locations. Installation of Sewer piping for the treatment plant. Final road construction of subgrade & base prep of roads & parking areas & landscape preparation.
Contract Amount: $1,365,402.00
Architect/Engineer: Keller & Associates
​
​
​
​
​
​
​
​
Owner / General:
City of Twin Falls – McAlvain Construction
5559 W Gowen Rd
Boise, ID 83709
(208) 362-2125
Project: Chobani Pretreatment Facility
Description: Sitework & Site Utilities subcontractor – Clearing & Grubbing of site, build building pad & excavate & prep footings, foundations, & slabs. Road Construction of Highland Ave., Parking Lot Preparation, & Gravel Surfacing. Installation of all process piping Glass-lined ductile iron pipe for Chobani waste materials.
Contract Amount: $1,018,798.00
Architect/Engineer: CH2MHill
​
​
​
​
​
​
​
​
Owner / General:
Sun Valley Company
2 Sun Valley Road
Sun Valley, ID 83353
(208) 622-2188
Project: Music Pavilion
Description: Site work and utilities- Excavation of a 30 deep hole for main structure all stadium prep.
Contract Amount: Contract Amount- $985,000.00
Architect/Engineer: